{"id":1153,"date":"2025-09-04T11:18:42","date_gmt":"2025-09-04T11:18:42","guid":{"rendered":"https:\/\/selcable.se\/?post_type=document&#038;p=1153"},"modified":"2025-09-04T11:18:42","modified_gmt":"2025-09-04T11:18:42","slug":"general-conditions-of-supply-of-cables-and-lines-kl-20-english-version","status":"publish","type":"document","link":"https:\/\/selcable.se\/en\/dokument\/general-conditions-of-supply-of-cables-and-lines-kl-20-english-version\/","title":{"rendered":"General Conditions of Supply of cables and lines KL 20 (English version)"},"content":{"rendered":"<p>This addendum includes supplementation and amendment of the terms and conditions of the General Conditions of Supply NL 17 and is intended for cables and lines.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>This addendum includes supplementation and amendment of the terms and conditions of the General Conditions of Supply NL 17 and is intended for cables and lines.<\/p>","protected":false},"template":"","meta":{"footnotes":""},"categories":[],"class_list":["post-1153","document","type-document","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/document\/1153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/types\/document"}],"version-history":[{"count":2,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/document\/1153\/revisions"}],"predecessor-version":[{"id":1156,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/document\/1153\/revisions\/1156"}],"wp:attachment":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/media?parent=1153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/categories?post=1153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}