{"id":2178,"date":"2026-06-15T18:23:16","date_gmt":"2026-06-15T18:23:16","guid":{"rendered":"https:\/\/selcable.se\/?p=2178"},"modified":"2026-07-05T21:08:33","modified_gmt":"2026-07-05T21:08:33","slug":"kraftkablar-ska-omfattas-av-iaas-ursprungsregler","status":"publish","type":"post","link":"https:\/\/selcable.se\/en\/kraftkablar-ska-omfattas-av-iaas-ursprungsregler\/","title":{"rendered":"Power cables shall be subject to the IAA rules of origin\u00a0"},"content":{"rendered":"<h4 class=\"wp-block-heading\">Selcable calls on Sweden, the European Parliament and the EU member states to work towards the re-inclusion of power cables for electricity transmission and distribution in the rules of origin under the Industrial Accelerator Act (IAA).<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">European cable manufacturers have the capacity to meet Europe&#039;s needs for transmission and distribution cables \u2013 made in Europe for Europe&#039;s energy transition, energy security and strategic autonomy. Selcable&#039;s view is in line with Europacable&#039;s position.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u27a2 Reintroduce power cables for transmission and distribution into the IAA rules of origin.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u27a2 Ensure that the regulations cover the EU, EEA\/EFTA and the UK.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u27a2 Recognize power cables as strategic grid infrastructure and a key technology for Europe&#039;s energy transition.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Selcable recommends the following:&nbsp;<\/strong><\/h3>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>1. Reintroduce power cables into the IAA rules of origin&nbsp;<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Power cables were covered throughout the EU Commission&#039;s legislative work and were only removed at a late stage. The Commission&#039;s impact assessment also identifies power cables as critical grid infrastructure where targeted &quot;Made in Europe&quot; requirements are justified.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>2. Ensure production in Europe for Europe&nbsp;<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The European cable industry has the capacity to meet Europe\u2019s needs for transmission and distribution cables. Investments of over \u20ac4 billion are underway and will more than double production and installation capacity by 2030. The European cable industry has a strong industrial presence not only within the EU but also in the UK, Norway and Switzerland, which play an important role in supplying the European market. This further strengthens the industry\u2019s ability to meet Europe\u2019s future needs for power cables for transmission and distribution.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>3. Ensure fair competition and reduce strategic dependencies&nbsp;<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Europacable raises the risk of overcapacity in subsidized operators outside Europe. IAA should contribute to fair competition and reduce Europe&#039;s dependence on suppliers outside Europe for critical energy infrastructure.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>4. Power cables are not the bottleneck for network expansion&nbsp;<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Europacable&#039;s analysis shows that the European industry has the capacity to meet the expected demand. The challenges lie rather in planning, permitting processes and project implementation.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>5. Made in Europe strengthens Europe&#039;s competitiveness and security&nbsp;<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Investment in European-made power cables strengthens employment, innovation, technological leadership, energy security and strategic autonomy. Secure and resilient land and sea cables are a prerequisite for Europe&#039;s energy system and future grid expansion. In light of the deteriorating security situation and the attacks on critical infrastructure in recent years, Europe needs to reduce its dependence on suppliers outside Europe for strategic components and ensure robust and resilient supply chains.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>In conclusion, power cables should be reintroduced into the IAA to ensure Europe&#039;s energy transition, energy security and strategic autonomy through power cables made in Europe for Europe.&nbsp;<\/strong><\/h4>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/selcable.se\/en\/dokument\/positionspapper-kraftkablar-ska-omfattas-av-iaas-ursprungsregler\/\">To the position paper<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>","protected":false},"excerpt":{"rendered":"<p>Selcable calls on Sweden, the European Parliament and the EU Member States to work towards the re-inclusion of power cables for electricity transmission and distribution in the rules of origin of the Industrial Accelerator Act (IAA). European cable manufacturers have the capacity to meet Europe\u2019s needs for transmission and distribution cables \u2013 made in Europe for Europe\u2019s energy transition, energy security and strategic autonomy. Selcable\u2019s view is in line with Europacable\u2019s [\u2026]<\/p>","protected":false},"author":4,"featured_media":2180,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19],"tags":[],"class_list":["post-2178","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eu"],"acf":[],"_links":{"self":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/posts\/2178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/comments?post=2178"}],"version-history":[{"count":4,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/posts\/2178\/revisions"}],"predecessor-version":[{"id":2225,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/posts\/2178\/revisions\/2225"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/media\/2180"}],"wp:attachment":[{"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/media?parent=2178"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/categories?post=2178"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/selcable.se\/en\/wp-json\/wp\/v2\/tags?post=2178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}