News

EU
2026.06.15

Power cables shall be subject to the IAA rules of origin 

Selcable calls on Sweden, the European Parliament and the EU Member States to work towards the re-inclusion of power cables for electricity transmission and distribution in the rules of origin of the Industrial Accelerator Act (IAA). European cable manufacturers have the capacity to meet Europe’s needs for transmission and distribution cables – made in Europe for Europe’s energy transition, energy security and strategic autonomy. Selcable’s view is in line with Europacable’s […]

Read more whether Power Cables should be covered by the IAA rules of origin 
EU
2026.03.06

EU presents Industrial Accelerator Act – cables missing

On 4 March, the European Commission presented the long-awaited Industrial Accelerator Act (IAA) proposal, which aims to strengthen Europe’s industrial capacity and increase demand for technologies and products that contribute to the climate transition and are produced in Europe. Cables are currently missing from the proposal. Previous drafts of the Industrial Accelerator Act included power cables […]

Read more if the EU presents the Industrial Accelerator Act – cables are missing